Initial situation
- •Space was limited – existing lines and mobile tippers had to remain operational during the rebuild.
- •The new control needed seamless integration into batch and recipe systems as well as existing S7-300 lines.
08/2021 – 03/2022
Primary tobacco processing in Ukraine (CEE) was expanded with seven mini silos, new conveyor equipment and a DIET interface controlled via Siemens S7-317F failsafe.
A structured migration avoided extended downtime and keeps maintenance windows short.
Every successful project starts with a plan and ends with a system that works. See what we've delivered for our customers.
04/2023 – 2024 • Tobacco manufacturing
Germany (DACH): ek robotics AGVs, Siemens S7-414F controls and WinCC link hall 8 and hall 2, including buffer conveyors, barcode validation and shuttle integration.
09/2022 – 07/2024 • Tobacco Industry
2-phase automation project: Greenfield installation of a complete addback line with subsequent mini silo integration for process optimization in the tobacco industry.
02/2025 – 06/2025 • Building materials
Two fully automated KUKA palletising cells for US building materials manufacturer with pallet magazine, conveyor technology, press table, paper applicator and automated handover to transfer carriage. Complete process from pallet supply to outbound.