PLC Programming
TIA Portal for S7-1200/1500(F) and STEP 7 Classic for S7-300/400(F). Structured programming, modular function blocks and complete documentation for functional testing and acceptance.
We guide your project from concept through commissioning – new plants as well as retrofits of existing controllers (S5/S7-Classic to S7-1200/1500, HMI to WinCC Unified). Based in Luxembourg: on site at short notice in Luxembourg, Saarland and the Trier region, projects in Switzerland and across the DACH region, commissioning worldwide.
by David Prybisch, M. Sc. Automation Engineering
Automation engineer · New plants & Retrofit · worldwide
Engineering office for Siemens automation with AI-assisted engineering

From troubleshooting a single controller to automating a complete plant
TIA Portal for S7-1200/1500(F) and STEP 7 Classic for S7-300/400(F). Structured programming, modular function blocks and complete documentation for functional testing and acceptance.
Safety concepts per ISO 13849, ProfiSafe programming and Distributed Safety. Failsafe PLC solutions (S7-1500F, S7-300F/400F) with emergency stop cascades and validated safety logic.
WinCC Comfort/Advanced and WinCC Unified with multilingual operator interfaces, recipe management and batch control. Including HMI migration: upgrading legacy WinCC Flexible and Comfort panels to WinCC Unified – screens are rebuilt (partially AI-automated).
Parametrization of SEW, SINAMICS and Danfoss frequency inverters. Positioning, motion control and axis coupling for precise motion sequences in production lines.
PID control, analog and digital control for pressure, temperature, flow and level. Process optimization and fine-tuning for stable production processes.
On-site commissioning of production lines worldwide. Operator training, functional testing and final acceptance as well as support until successful handover to your production.
When only an online snapshot without symbols, without described DBs and without network comments remains: re-documentation of S5 and S7-Classic programs, AI-assisted. Also reconstruction from scanned schematics when the E-Plan is missing. On request directly combined with migration to TIA Portal.
Looking at it from the automation side, we show what your plant data can be used for, and then we build it: data access via OPC UA, dashboards, fault and downtime analysis, reporting. AI evaluates the data read-only; the PLC stays deterministic.
We work in a hybrid way: the engineer designs the solution and sets the structure and style, while AI agents take on part of the routine work. Program, HMI and documentation are ready sooner, and the engineer keeps the direction.
“We” means David Prybisch as the responsible engineer, working with a well-established set of AI agents. He directs the agents, checks every result and feeds corrections back. Decisions and sign-offs are his to make.
AI-assisted engineering
We start by clarifying sequences, interfaces and constraints with you. Depending on the project, this leads to a functional specification; often the requirements specification, schematics and existing program are enough to work from.
The engineer defines the program structure, programming style, tag naming and screen concept. These rules are the framework the AI agents work within.
The PLC program and HMI are built by the engineer together with AI agents. The AI takes on part of the routine work, such as recurring blocks, tags and screens, or translating existing code to the target platform. That speeds up the build.
The engineer reviews the program and HMI in full and passes improvements back to the AI agents. A first draft rarely fits straight away, so this loop continues until both follow the defined structure and style.
The PLC program and HMI run together in simulation and are tested with AI assistance: sequences, edge cases and faults, as well as the interface between the two. Every tag has to arrive correctly on screen, every button in the controller. The results are logged.
The engineer downloads the program to the real controller, tests automatic mode, HMI and safety functions on the plant and sees it through to acceptance.
More testing
Sequences, edge cases and faults are run through in simulation before the plant is built. Errors surface at the desk, not during commissioning.
Better groundwork
I/O lists, tag tables and program drafts are ready earlier. More of the engineer's time goes into design, review and coordination.
Documentation that did not exist before
Functional specification, comments and test logs are produced alongside the project, including for existing plants whose documents have gone missing.
Fixed price after review
Clearly scoped services: we review your documents first, then quote a fixed price.
Schematic inventory analysis
I/O list and tag table from your PDF drawing set, as a basis for programming or a retrofit.
Example: a 51-page schematic turned into an I/O list and tag table in about eleven minutes.
Re-documentation
Functional specification derived from existing code, including S7-300 STL without symbols.
WinCC Unified screen package
Screens, alarms and tags derived from the PLC structure, tested in simulation.
Retrofit check
Effort estimate and hardware mapping for moving from S7-300 to S7-1200 or S7-1500.
Project data is never used to train AI models. We work on our own systems rather than in public chat tools, agree the data flows with you before the project starts and sign a non-disclosure agreement (NDA) on request.
New development, retrofit, and technical support – with proven project experience
From concept phase to commissioning – PLC programming, safety concepts and material flow integration for new automation solutions.
View referencesMigrate S5 and S7-Classic to S7-1200/1500, upgrade HMIs from WinCC Flexible or Comfort to WinCC Unified – screens rebuilt (partially AI-automated). Also possible without symbols, if online snapshot and scanned E-Plan are available.
View referencesTroubleshooting, parameterization, logic adjustments, and commissioning – technical support on-site and remote.
View referencesFrom automation planning to commissioning – or quick help with malfunctions and issues. Engineering at a fixed price after review, commissioning usually billed on a time basis.
Response within 24h on business days · Initial consultation free