Central plant overview at a beverage site
Beverage producer, Germany · engineering partner on behalf of a general contractor
- Starting point
- Ten separate lines with their own PLCs and panels in different TIA versions. The goal was a central overview without intervening in the machine controllers.
- Scope
- Central visualization with WinCC Unified PC Runtime V21, read-only access to all ten PLCs and remote view of the existing panels. Licensing sized to actual demand: 500 instead of 1,000 PowerTags.
- Result
- On-site commissioning in August 2026, runtime and web client in operation. As of October 2026, the remaining lines follow once plant IT releases the network ports.